SANT JOSEP PRIMARY SCHOOL

Sant Vicenç dels Horts • Jordi Badia • Project 2007 • Construction 3.350 m2 • Cost 3.287.835 € • Developer GISA Departament of Education

Project


CEIP Sant Josep
Images: 1 | 2 | 3 | 4
Draws: 1 | 2

The plan for the primary school is a ground floor+1 parallel to the Barcelona road, from which a walkway provides the main entrance to first floor, so taking advantage of the difference in height at that point.

Primary classrooms are on the first floor on either side of a corridor which runs the length of the building.

One full-length window on each façade provides all the necessary light.

Classrooms on the ground-floor kindergarten have their own playgrounds. Also on this floor is the canteen-dining area and auxiliary rooms.

The gym appears semi-covered due to the difference in height of the plot.

Construction of the new primary school will reorganise and unite the different buildings currently spread out across the plot, and allow to double the number of pupils.

Team

  • Architecture
    Jordi Badia + Daniel Guerra + Albert Duque
  • Collaborators
    Diego Cámara, Mercè Mundet, Nicola Rigoli
  • Fixtures and Fittings
    Consulting LLuís Duart
  • Structure
    BIS Arquitectes
  • Calculations and Budget
    Forteza Carbonell Associats SCP

 


BAAS