SALT HEALTH CENTRE

Salt • Jordi Badia • Project 2004 • Completed 2006 • 1.344 m2 • 2.134.931 €

under construction

Project

Salt Health Centre
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9


The plan is developed on the ground floor, except for some private areas on the first floor. The consulting area is designed around a set of courtyards, which provide natural light.
This design intends to take prefabricated and industrialized architecture to the limit and results in a style exercise on this subject. The whole structure (façade walls, inside finish, fake ceiling, etc) is a fusion of catalogue products based on a strict modulation. In the future, this could result in a way of building similar constructions cutting time and costs.
The form is of a black, shiny prism, very opaque in order to guarantee maximum privacy yet, in contrast, full of natural light coming from the inside courtyards. The windows, being placed high-up in the consulting area and at the low-down in the waiting rooms give total privacy.

Team

  • Architecture
    Jordi Badia + Rafael Berengena + Andreu Orradre + Daniel Guerra.
  • Services Engineer
    Consulting Lluis Duart SL.
  • Structural Engineer
    Eduard Doce.
  • Quantity Surveyor
    Forteza Carbonell Associats.

 


BAAS
Montserrat de Casanovas 105 - 08032 Barcelona (Spain), Tl. 93.358.01.11

© 2006 BAAS S.L, all rights reserved.
Diseño web: Agencia interactiva eabarcelona